1
2
3
4
5
6
7
8
9
10
Boat 1
Boat 2
Boat 3
Launch 1
Launch 2
In each link you will found 5 pictures JPG with comments.
October 2002
1. Keelson and frames traced on 5mm plywood.
2. Keelson and frames mounted with mast base blocks and the strips holding the cannons.

3. Strips from load waterline toward 2nd deck: 3 walnut 6mm - 2 ramin 6mm - 2 walnut 6mm - 2 ramin 6mm - 2 walnut 5mm - 2 ramin 5mm - 1 walnut 5mm.
From keelson up: 5 ramin 6mm.

4. Rest of strips below load waterline ramin 6mm.

5. All the strips except some strips in stern.
